Chemlok

Chemlok 213 Urethane-to-Metal Adhesive

Solvent-based adhesive for castable and RIM polyurethane-to-metal bonding, with selected TPU applications and a Chemlok 219 primer option for environmental resistance.

Request pricing, technical documents, or application guidance.

Made-in-China.com Audited Supplier badge for Hongtu ChemicalMade-in-China.com Diamond Member badge for Hongtu Chemical

Working with Hongtu

Based in Qingdao, China, Hongtu Chemical supplies Chemlok 213 as an authorized distributor. We help overseas customers select materials, evaluate samples and run production trials, and arrange export packaging and shipment. We have our own dangerous-goods warehouse and hold qualifications for dangerous-goods exports.

Industrial product cans and bottles displayed together on a tableHigh-rise buildings along the Qingdao waterfrontMetal pails and white jerrycans on tall shelves on both sides of a warehouse aisleA pale lavender metal drum with a front-facing HONGTU label

Product overview

Chemlok 213 is a solvent-based adhesive for bonding castable and reaction injection molded (RIM) polyurethane elastomers to metal. It supports polyether and polyester castable systems based on TDI or MDI, as well as millable urethane and selected thermoplastic polyurethanes (TPU).

One-coat and primer-assisted use

For RIM polyurethane on aluminum or steel, Chemlok 213 can be used directly without a primer or prebake. Where increased resistance to water, salt spray and temperature exposure is required, it can be applied over Chemlok 219 primer. The two-coat system has its own prebake requirements.

Application and drying

Clean and prepare the metal to remove oils, grease, rust and oxide layers. Apply a uniform film by brush, spray or dip. Keep the substrate at 82°C or below during application to avoid film bubbling. The dry-film thickness should be 19.05–31.75 μm; excessive film build can reduce performance.

Allow coated parts to air-dry for 30–60 minutes at room temperature. Forced drying may be used at temperatures up to 93°C.

When using Chemlok 219 primer, apply and air-dry the primer before applying and air-drying Chemlok 213. For optimum performance of this two-coat system, the recommended prebake is at least 2 hours at 121°C. Large parts such as roller cores may need 4–8 hours at 121°C, depending on size.

Typical properties

Property Typical value
Appearance Blue liquid
Viscosity at 25°C 100–300 cps, Brookfield LVT, spindle 2, 30 rpm
Cup viscosity at 25°C 20–35 seconds, Zahn cup #3
Density 870–910 kg/m³
Solids by weight 20.5–23.5%

Typical values are for reference, not product specifications. Confirm the selected coating system and heating cycle for the polyurethane and part geometry.

Supply and technical enquiries

Contact our team for quotations, technical documents or advice on polyurethane bonding.

Contact

Request a quote for Chemlok 213

Tell us the quantity you need and the delivery destination. Include any packaging requirements or preferred delivery date.